Log In

KRMC Mountain Shadow Medical Office
Wednesday, 26 October 2011 09:51

 

 

(Kingman, AZ) TR Orr completed Kingman Regional Medical Center's newest building at 2226 Hualapai Mtn Road in October of 2011.  MEAI performed pre-design surveying, site-grading-drainage-utility design, construction special inspections, and construction staking for the project.  The 11,303 square foot medical facility was designed by Morfeld Ray Architects.

 

Latest News

12 January 2012, 11.51
(Bullhead City, AZ) Mohave Engineering teamed with DLR Group and Michael Taylor Architects to prepare grading, drainage, and utility plans for the new...
27 October 2011, 07.18
(Golden Valley, AZ) SOLON SE obtained Grading Permit and Site Plan approval from Mohave County in October for a new 10 MW site near Kingman (see article...
26 October 2011, 09.51
    (Kingman, AZ) TR Orr completed Kingman Regional Medical Center's newest building at 2226 Hualapai Mtn Road in October of 2011.  MEAI performed...
06 July 2011, 06.01
(Kingman, AZ) Long Mountain Development began constructing approximately 11 acres of commercial property along Highway 66 in Kingman, across from the...
25 June 2011, 05.40
(Mohave Valley, AZ) Mark A Golden Construction wrapped up construction of the Everglades Channel in June, 2011.  With an estimated construction cost of...

2153 Gordon
PO Box 6547
Kingman, AZ 86401
(928) 753-2627
(928) 753-9118 (fax)

Copyright © 2012. Mohave Engineering Associates, Inc.
All rights reserved.