Griffith Water System and Tank Design (Mohave County, AZ)
Water Quality Analysis and design of four well sites and approx. seven miles of waterline to serve Griifith Energy Power Plant. Design 750,000 gallon water tank for fire protection.
(Bullhead City, AZ) Mohave Engineering teamed with DLR Group and Michael Taylor Architects to prepare grading, drainage, and utility plans for the new...
(Golden Valley, AZ) SOLON SE obtained Grading Permit and Site Plan approval from Mohave County in October for a new 10 MW site near Kingman (see article...
(Kingman, AZ) Long Mountain Development began constructing approximately 11 acres of commercial property along Highway 66 in Kingman, across from the...
(Mohave Valley, AZ) Mark A Golden Construction wrapped up construction of the Everglades Channel in June, 2011. With an estimated construction cost of...