Log In

Construction Services

To meet the complete construction requirements of our clientele, MEAI operates a fully certified independent laboratory facility located at our corporate office.

From initial project design through final approval, our construction services department ensures rapid and timely test data reporting. Our laboratory technicians inspect and test virtually every type of soil and construction material.

We offer a full range of site inspection, testing and quality control programs that allow our clients the opportunity to work with a single reliable and dedicated firm throughout the life of the project.

Growing liability concerns, government regulation and increased quality standards demand thorough field control and well documented project compliance. A systematic oversight of sequential work product eliminates substandard workmanship and ensures a safe, timely, and certified project completion.

Our testing and inspection services include:

  • Concrete
  • Soils/Aggregate
  • Asphalt
  • Masonry
  • Grout
  • Special Inspections

Our construction management services include:

  • Contract Analysis
  • Bid Selection
  • Document Preparation
  • QC/QA Management
  • QC/QA Plan / Submittals
  • Project Scheduling and Coordination


Canyon Distributing (Golden Valley, AZ)
 
Chrysler Proving Grounds (Yucca, AZ)
 
City of Kingman Airport Addition improvement District (Kingman, AZ)
 
Kingman Airport Authority (Kingman, AZ)
 
Mineral Park Mine (Golden Valley, AZ)
 
Sunrise Vistas Booster Station (Fort Mohave, AZ)
 

Latest News

12 January 2012, 11.51
(Bullhead City, AZ) Mohave Engineering teamed with DLR Group and Michael Taylor Architects to prepare grading, drainage, and utility plans for the new...
27 October 2011, 07.18
(Golden Valley, AZ) SOLON SE obtained Grading Permit and Site Plan approval from Mohave County in October for a new 10 MW site near Kingman (see article...
26 October 2011, 09.51
    (Kingman, AZ) TR Orr completed Kingman Regional Medical Center's newest building at 2226 Hualapai Mtn Road in October of 2011.  MEAI performed...
06 July 2011, 06.01
(Kingman, AZ) Long Mountain Development began constructing approximately 11 acres of commercial property along Highway 66 in Kingman, across from the...
25 June 2011, 05.40
(Mohave Valley, AZ) Mark A Golden Construction wrapped up construction of the Everglades Channel in June, 2011.  With an estimated construction cost of...

2153 Gordon
PO Box 6547
Kingman, AZ 86401
(928) 753-2627
(928) 753-9118 (fax)

Copyright © 2012. Mohave Engineering Associates, Inc.
All rights reserved.